Backend output from the supplied 2023–2025 data. Computed by the Visarjan Ghat Watch backend (Python, tested) from the supplied MPPCB readings for 2023–2025 and the CPCB criteria file. Not live data. There are no 2026 measurements. Report page references come from the data file. Only a partial manual spot check has been done against the PDFs; other page references are not yet checked.

Work orders

DRAFT — recommendation requiring verification. Not an issued or completed work order.

Work order (draft)

Bairagarh (Sant Hirdaram) kund

Upper Lake

Tier 1High risk

Zone / ward: Assign: ____

Prepared for issue by: Visarjan nodal officer, BMC (role; assumption)

Plan start (set the real issue date when issuing): 11 Oct 2026

Why this ghat

DO below 4DO 0DO often below 5BOD often above 3Data gap
  • Dissolved oxygen fell below 4 mg/l in 6 of 13 readings (lowest 0 mg/l).
  • Dissolved oxygen read 0 mg/l 4 times.
  • Dissolved oxygen was below 5 mg/l in 11 of 13 readings.
  • BOD was above 3 mg/l in 13 of 13 readings.
  • Some DO, BOD or pH readings are missing. Missing is not treated as passing; a gap adds a sampling action instead.

Tasks

#WhatWhenResponsible roleDone

Where: “Sant Hirdaram Visarjankund, Bairagarh, Bhopal” · “Sant Hirdaram visarjan kund,Bairagarh(upper lake),Bhopal” · “Sant Hirdaram Visarjan Kund, Bairagarh (Upper Lake), Bhopal” · Location note: ____

Target to report against (27 Oct sample)

  • Dissolved oxygen 5 mg/l or more
  • BOD 3 mg/l or less
  • pH 6.5 to 8.5
  • Total coliform 500 MPN/100 ml or less (Not in current data; needs a new test)

Report back to the visarjan nodal officer by ________ (date set by the nodal officer)

  • Tick sheet of tasks done
  • Photos before and after
  • Dates the aerators started and stopped
  • Quantity of debris removed, if measured

No cost figures are included in work orders.

Generated from MPPCB visarjan reports 2023–2025 by Visarjan Ghat Watch. Recommendations for officer verification. Not an official MPPCB assessment.
Short text for forwarding
Work order (draft): Bairagarh (Sant Hirdaram) kund
DRAFT — recommendation requiring verification. Not an issued or completed work order.
• 13–18 Oct: Water sampling — MPPCB regional office, Bhopal (assumed — confirm)
• 15–20 Oct: Barricading & nets — Assign: ____
• 17–27 Oct: Aeration — Assign: ____
• 18–22 Oct: Cleaning & debris — Assign: ____
• 20–27 Oct: Aeration — Assign: ____
• 27 Oct: Water sampling — MPPCB regional office, Bhopal (assumed — confirm)
Recommendation — verify with MPPCB / CPCB guidelines.
Report back to the visarjan nodal officer by ________ (date set by the nodal officer)